+34 985 980 951 / 611 083 001|info@dogram.es

doGramAdm

About doGramAdm

This author has not yet filled in any details.
So far doGramAdm has created 86 blog entries.

Ceramic pattern for laser equipment calibration

2024-03-07T13:09:40+01:00

The use of reverse engineering equipment for dimensional and geometric control is becoming increasingly common, as their versatility and precision make them a viable option compared to higher-precision equipment such [...]

Ceramic pattern for laser equipment calibration2024-03-07T13:09:40+01:00

3D Digitization of Tudela Veguín Cement Plant

2024-02-27T10:13:03+01:00

The Tudela Factory, located in Tudela Veguín, a locality within the municipality of Oviedo, dates back to 1898, being considered as Spain's first cement factory. Currently, this plant produces construction [...]

3D Digitization of Tudela Veguín Cement Plant2024-02-27T10:13:03+01:00

Marqués de Casa Valdés 2 y 4 (Gijón)

2024-02-06T14:34:00+01:00

Photogrammetric survey of the current state and study of the façade of the buildings 2 and 4 on Marqués de Casa Valdés Street forGoya Intercontinental.

Marqués de Casa Valdés 2 y 4 (Gijón)2024-02-06T14:34:00+01:00

Virtual Replica Maestro Mateo

2024-02-06T14:40:20+01:00

Digitalization and creation of virtual replica through photogrammetric techniques of nine sculptures, belonging to the exposition Maestro Mateo of the Museo Nacional del Prado.

Virtual Replica Maestro Mateo2024-02-06T14:40:20+01:00

Photogrammetric survey Medieval Bridge of Puente de Arco

2024-02-06T14:43:23+01:00

Previous study of the current state and it acts as a reliable document into the elaboration of the intervention project for its rebuilding. So, with the obtained photographs, it is possible to evaluate its state, look for cracks, create maps of pathologies, take measurements and calculate possible falls.

Photogrammetric survey Medieval Bridge of Puente de Arco2024-02-06T14:43:23+01:00

Photogrammetric survey Monastery of Cornellana

2024-02-06T14:46:57+01:00

When the first stage of the rebuilding of the Monastery of Cornellana finished, the step is the second stage, still without programming but it will start with a project about mural archaeology, the consolidation of spaces and the archaeological style (Diario El Comercio, May 2016).

Photogrammetric survey Monastery of Cornellana2024-02-06T14:46:57+01:00
Go to Top